*Home
*Lectures
- Model Questions
- Question Papers
- Social Media
- About
*Home
*Lectures
• Switch on the main power supply.
• Switch on the ELITE Pro switch.(Back side of machine)
• Switch on the monitor.
• Monitor will display starting ACL, please wait and then system load in progress.
• For log in enter user and password.
• Database view appears on screen.
• Menu contains: ‘Analysis’ ‘QC’ ‘Calibration’ ‘Diagnostic’ ‘Setup’ ‘utility’
• Select option ‘Diagnostic’ then moves to maintenance and everyday change cleaning cycle date.
• Select option ‘Diagnostic’ then moves to cleaning and start.
• After completion of cleaning select ‘Analysis’ and move to multitest session
• Multitest preanalysis displayed on monitor then click on circle (Number) and enter sample ID then select test like PT or APTT then confirm test.
• Daily controls are run first.
• Then for second sample just like first sample select position and enter sample ID
• After loading all samples click on box then press on ‘RUN’.
• Then monitor will display ‘Pre Analysis in progress’ then pre analysis result control pannel is displayed then select ‘Continue’.
• Samples are tested automatically. Results are displayed on screen.
• After completion select cleaning and in last shut down.
• Switch on the main power supply.
• Switch on the ELITE Pro switch.(Back side of machine)
• Switch on the monitor.
• Monitor will display starting ACL, please wait and then system load in progress.
• For log in enter user and password.
• Database view appears on screen.
• Menu contains: ‘Analysis’ ‘QC’ ‘Calibration’ ‘Diagnostic’ ‘Setup’ ‘utility’
• Select option ‘Diagnostic’ then moves to maintenance and everyday change cleaning cycle date.
• Select option ‘Diagnostic’ then moves to cleaning and start.
• After completion of cleaning select ‘Analysis’ and move to multitest session.
• Multitest preanalysis displayed on monitor then click on circle (Number) and enter sample ID then Select test like PT or APTT then confirm test.
• Daily controls are run first.
• Then for second sample just like first sample select position and enter sample ID.
• After loading all samples click on box then press on ‘RUN’.
• Then monitor will display ‘Pre Analysis in progress’ then pre analysis result control pannel is displayed then select ‘Continue’.
• Samples are tested automatically. Results are displayed on screen.
• After completion select cleaning and in last shut down (Screen & monitor ) and switch off (backside of machine).
Maintenance:
• Cleaning cycle - Everyday
• Rinse Waste Reservoir - Weekly\
• Clean Optical Sensors & Windows – Every 14th day
• Clean Air Filter – Every 28th day