*Home
*Lectures
- Model Questions
- Question Papers
- Social Media
- About
*Home
*Lectures
Put the power cable to socket.
Turn on Switch.
Open the lid of centrifuge.
Load the rotor with its components of tubes/ Vacutainer.
Close the lid of Centrifuge.
Move speed control knob clockwise from “0’ position.
To stop move speed control knob to “0’ position.
Centrifuge de-accelerates.
Open the centrifuge lid.
Remove tubes/vacutainer
MAINTENANCE SCHEDULE
(within 8 hrs.) 1 % Sodium hypochlorite. Let the hypochlorite in the bucket for 20 minutes. After 20 minutes, invert buckets to drain dry.