User Tools

Site Tools


nchsls:c:clinical_pathology:document:wdi_of_centrifuge-cp

WDI FOR LAB CENTRIFUGE [TEST TUBE]

Procedure 1. Switch on the main power supply.

2. Then put the balanced test tube inside and then start on the switch of centrifuge.

3. For Urine the RPM is 2000 for 10 min.

4. After finish the work Switch off the main power supply.

Maintenance Clean the instrument with clean mop.

nchsls/c/clinical_pathology/document/wdi_of_centrifuge-cp.txt · Last modified: 2022/08/13 07:34 (external edit)