Because the call may not be answered or may not be taken seriously, send a personnel to the electrical department.
If necessary,shutdown some of the less essential equipment like computer and centrifuge may be switched off.
Once the power supply is restored,make sure that required equipments are switched on again specially server and backup-server needs to be started manually .
nchsls/c/biochemistry/document/procedure_for_action_during_electrical_failure.txt · Last modified: 2022/08/13 07:34 (external edit)