WDI of Centrifuge

Put the power cable to socket.

Turn on Switch.

Open the lid of centrifuge.

Load the rotor with its components of tubes/ Vacutainer.

Close the lid of Centrifuge.

Move speed control knob clockwise from “0’ position.

To stop move speed control knob to “0’ position.

Centrifuge de-accelerates.

Open the centrifuge lid.

Remove tubes/vacutainer

MAINTENANCE SCHEDULE

(within 8 hrs.) 1 % Sodium hypochlorite. Let the hypochlorite in the bucket for 20 minutes. After 20 minutes, invert buckets to drain dry.