| references | Urea Kit literature of Transasia page 1 | Note- 26th cycle OD of both level (qc 5, qc8) has to enter in URBL in LJ chart manually three times a day with each IQC run. 26th cycle OD should be more than 1.2, if it goes below 1.2, it is the sign of urea reagent deterioration. | |
| Urea Kit literature of Transasia page 2 | |||
| urea kit litrature spinreact.pdf | |||
| urea kit litrature meril | Note: When a new lot is opened, verify kit literature with the uploaded version. | ||
| Upload newer version when required and make necessary changes in procedure and process |
| environmental and safety controls |
| MSDS of Transasia Kits |
| MSDS of spinreact kits |
*NOTE* fOR EACH TIME,