== Set Up The Lab For Instrument ==
Space for Instrument
Water Supply
Electricity Supply
Waste Maagement
== Installation Of Instrument ==
Get install Instrument by Its company person(Engineer).
Collect Installation Report.
Save This report in LIS under the menu 'Equipment Records'.
== Check Basic works Of Instrument ==
Simply start Maintenance for checking of all probes movements.
Check probes positions in all troughs(sample trough,reagent trough, stirrer troughs).
Check Up-Down movements of all Probes.
Check Movements of Cuvette Rinsing Unit(CRU) by giving Cuvette Ringe.
== Check Actual works Of Instrument ==
Set All the TESTS.
Do calibrations of each tests, calculate factor and enter for according tests.
IQC and LJ Chart.
Start doing IQC for each test, three times per day.
After collecting adequate IQC data, calculate mean(Target) and SD for each test. Set those targets and SDs in LJ.
Prepare LJ chart Daily.
Instrument Comparison
Run same samples for each tests in both the instruments, New Instrument (ERBA_XL_1000) and Current Instrunment (ERBA_XL_640).
Prepare excel sheet,Calculate Difference,Compare the results.
Draw Regression analysis chart, Bland-Altman Plot and do analysis of it.
Prepare acceptability Criteria.
And if needed, take action accordingly.
For EQC
Register new instrument in RIQAS Programme.
After Registration Done, Run current EQC sample, Prepare Excel Data Sheet.
Send the results to RIQAS on according Date.
Get the analysis report of our data from RIQAS.
Prepare monthly file based on RIQAS results.
Do analysis of this monthly file.
Take actions if needed.