====SOP of Validation of new lot of reagents==== Objective:\\ To validate new lot of reagents before use\\ Requirement:\\ • New lot\\ • Validated lot in use\\ • Testing sample\\ Procedure:\\ • We validate every new batch of reagents by running the sample first with the old reagent and then re running it with new set of reagents and results are compared.\\ • There should be positive linear regression(R squared - 0.5 to 1) between two lot.\\ • Lot validation records of reagents are filed in respective instrument internal quality control records HI\Records\File\9\Internal QC records.\\ Stains:\\ • In case of stains 2 slides are prepared from the sample at same time fixed and then stained with old stain as well as newly prepared stain.\\ • The quality of slide staining is checked by senior resident.\\ • Lot validation records of stains are maintained in separate registers. HI\Records\File\9\Internal QC records-J\\